|
September 12, 2008 Spane Buildings finished the roof tiles. We are now preparing to install the radiant floor heating.
|
![]() |
![]() |
| View from the back yard
|
|
![]() |
![]() |
| View from the driveway
|
|
![]() |
![]() |
| The radiant floor heating material start to
arrive,
|
Patches enjoys excavating.
|