July 28, 2008

Spane Buildings continues to work on the
woodshop and kennel building frame.

Back

View from the driveway of the building frame
(the taller poles will be the second level of the building)

 

View from the driveway of the roofline extending from
the covered kennel runs (on the right) to the building (on the left)

 

The covered kennel runs.

 

Another view of the covered kennel runs.

 

Violet decides to leave her whelping box for a quick jaunt in the sun.

 

Windows arrived today.

 

 

 

 

 

                                 

 

 

Copyright (c) 2010 - Galfox Kennel

All Rights Reserved