August 6, 2008

Spane Buildings adds the second floor to the
woodshop and kennel building frame.

Back

View from the driveway of the new second level

 

View from the back yard of the covered runs and the new second level

 

Closer view of the covered kennel runs and the new second level

 

View from the back of the building

 

The second story is taking shape!

 

An opening left in the second level for the stairs.  You can see the large window frame that will be a part of the new kennel room on the first floor.
Patches is still excavating.

 

Violet runs free!  puppies?  what puppies?!

 

 

 

 

 

                                 

 

 

Copyright (c) 2010 - Galfox Kennel

All Rights Reserved